3. 150 meters left to join the Bosphorus Bridge (Video)

  1. 150 meters to the junction of the Bosphorus Bridge: Minister Binali Yıldırım announced that there is 150 meters left to join the two sides in the Yavuz Sultan Selim Bridge project.
  2. Construction of the Bosphorus Bridge and the Northern Marmara Motorway project started in 2013. In the ongoing highway project, 150 meters left to join the two sides.
    BAKAN YILDIRIM DESCRIPTION
    Minister of Transport, Maritime Affairs and Communications Binali Yıldırım, 3. He made important statements about the construction of the bridge.
    "150 METERS LEFT TO JOIN THE BRIDGE"
    Stating that the bridge is at the completion stage, Minister Yıldırım said, “I think the last 150 meters remain to join. In the next 5-10 days, the silhouette of the bridge will appear with the bridge deck and suspension ropes. The completion of the bridge will be completed in May… Everything will be completed with covering and lighting. However, we want to open them all together with the connection roads and junction exits. Therefore, the third bridge and its roads will be fully ready for opening like August this year ”.
  3. THE FIRST STAGE OF THE AIRPORT WILL OPEN IN FEBRUARY 2018
    Minister Yıldırım also made a statement about the 3rd Airport and said, “When all stages are completed, an expenditure of approximately 10 billion 247 million Euros will be made. In February 2018, the first section, with a capacity of 90 million, will be opened. Thus, the troubles we have experienced at Atatürk Airport will be completely eliminated. When we put the new airport into operation, there will no longer be scheduled transportation at Atatürk Airport, ”he said.
Armin

sohbet

    Be the first to comment

    Comments