All Infrastructure Renewed on Akçaray Tram Route

Akçaray Tram Route All Infrastructure Renewal.Kocaeli to reach the age of the infrastructure infrastructure works in the Akçaray Tramway, 3 is carried out from three separate points with a separate team.
During the Yahya Captain stage of the project, the construction of the infrastructure at Hanlı street, Salkım Söğüt Street and the infrastructure at Sarı Mimoza and Necip Fazıl Street were started. With the completion of the works that will change all the infrastructure for a long time, the tram line excavation will be started and the rails will be laid.
The works of the Tramway Project, which will be realized by Kocaeli Metropolitan Municipality, will ease the transportation network of the city. In the giant project that will meet the important need of the city, the infrastructure production at the points where the line will pass is completed. Within this scope, all rain water, sewage, drinking water, telecom, fiber and natural gas infrastructures are being renewed. With the renewal of the productions in the Yahya Kaptan region, which covers the starting point of the project, the lines are provided to the citizens for many years.
The works started in Salkım Söğüt Street with Hanlı street and continue in Sarı Mimoza and Necip Fazıl Street. Infrastructure works are carried out with a separate team 3, is intended to be completed on time. Alternative routes are created to prevent citizens from being affected. In this direction, planning is made in order to protect the current traffic flow on the streets of Sarı Mimoza and Necip Fazıl.
The work at Yahya Kaptan, which is located in the first stage of the Tramway Project, is planned to be completed by February at the 29 according to the weather conditions. With the completion of infrastructure construction, tram superstructure manufacturing will be started in early February. Thus, in the ongoing construction of the Yahya Kaptan region, the crew will assemble the first rail assembly in early February. Preparations for the installation of the rails are carried out at the tram depot area.



Railway News Search

Be the first to comment

Comments