Kocaeli Metro Line to Meet in 2025

Kocaeli Metro Line will meet in 2025: The Metropolitan, which will start to serve in Kocaeli with 249 vehicles of 12 meters in length, 93 even on February 1, switches to the new system in transportation.
240 bus 1 will be in service as of February. Kocaeli Metropolitan Municipality Secretary General Tahir Buyukakin held a press release about new works on the newly organized public transportation system and transportation infrastructure. Deputy Secretary General Doğan Erol, Head of Transportation Department Mustafa Altay, Head of Public Transport Salih Kumbar, Head of Press and Public Relations Department HASAN Yılmaz, General Manager of Transportation Park Inc. Yasin Özlü, Chairman of the Department Ömer Polat and unit managers attended to the press. The new 240 bus and the 49 bus previously received in the meeting, the 249 bus 93 or even 1 will be on line from February.
WE ARE LIVING WE ARE LIVING TO LIFE
Stating that the public transportation system and transportation infrastructure network should be integrated with each other in cities, Secretary General Tahir Büyükakın said, “It is necessary to measure whether there is a problem in this system and to make a correction. He cannot do anything for the future without planning. Plans should be made to manage the future. We made the Transportation Master plan for transportation. The Transportation Master plan is behind all the decisions we make regarding transportation. We also made a logistics master plan. 65 percent of the trucks entering this city have a job in Kocaeli. Therefore, it is necessary to plan the transportation system by considering the logistics plan ”.
4 FLOOR CARPETS
Making a presentation with statistical information at the meeting, Büyükakın said, “The population of Kocaeli was 2014 million 1 thousand in 649, and the expected population is expected to be 2035 million 3 thousand in 900. The number of employees will increase from 411 thousand to 1 million 552 thousand. The number of students will double and there will be an increase in income. When there is an increase in income, the number of automobiles, which was around 2014 thousand in 205, will reach around 2035 in 858. While the daily journey was around 2014 million 2 thousand in 578, this figure is expected to be 2035 million in 8. In 2035, the number of trips will increase 4 times and the number of vehicles will increase 4 times. But we do not have the chance to increase the roads four times in Kocaeli. That is why we need to establish a new system ”.
EXCEPT OF 24 FROM 30 PERCENT
Drawing attention to the decrease in the number of people in public transportation, General Secretary Tahir Büyükakın said, “While our 2 thousand public transportation vehicles in this city currently transported 2013 million in 117, they decreased to 2015 million in 111. This decreases as people start to use their own vehicles and do not prefer public transportation. We do not have a public transportation system to deter people from using their vehicles. For this, it is necessary to make public transportation attractive. In 2014, only 2 thousand of the 578 million 611 thousand transports are made by public transport. If we do not change our system until 2035, the daily journey in public transport will remain at 1 million 300 thousand. This will make the traffic in the city worse than the traffic in Istanbul. Our goal is to increase public transportation to 30 percent ”, he said.
SHOULD BE PREFERED TO CHOOSE THE COLLECTION
Noting that Büyükkak should have attractive reasons for people to prefer public transportation and that innovations should be made in public transportation, “In order to prefer public transportation, it is to make connection roads that will integrate into the national networks for the transportation network and to make additional intersections and roads to the existing roads. There should be rail systems and rubber wheel systems. This system should not be the current system. Parking lots must be taken under control. Parking lots should be planned in such a way that people need to park their cars and make them use public transportation. Crossroads, new roads and new highways are currently planned. We made 200 kilometers double road. 1900 kilometers of roads and 48 intersections were built. Some of the 40 intersections are currently under construction, and some of them have started. It will be over by 2019, ”he said.
NEW RAIL SYSTEMS WILL BE
Tahir Büyükkakın noted that many of the projects were completed in order to establish the network of rail network throughout Kocaeli, and land After the projects related to the rail system, the General Directorate of Infrastructure Investments is expected to approve. We got approval for the tram and we started. Starting from the Gulf, Cengiz Topel Airport will go to the metro line of the project is over. The tender will be made after the implementation plan. In 2025, however, we can achieve this. Infrastructure General Directorate of Investments 2030 year for a line in the South and Gebze can be made for the line says. In 2025, the fastest train can be set up in the Gulf on the Railway. We will take the tram on the 6 2017 9 tram line between Otogar and Seka Park. Gebze-Darica Metro line will be announced on Wednesday. At the first stage, 11 station line of 6 will be projected. 8 station line will be made in 1,5. Even the project takes 2025 years. Therefore, we planned all our projects according to XNUMX year. Planned to implement the rail system in Kocaeli, and continue to work, emi he said.
400 VEHICLE ELEVATOR CAR PARK
Büyükakın pointed out that there are important projects for the city center. 400 car park with elevator. There will be a parking project in the Thursday market. There will be automatic parking system in our car parks. Street top parking system is the subject of discussion. We don't want to make money on street parking garages. Traffic control center came to tender process. 2016 is auctioned in and will be completed in 2017. Violations of speed, parking and red light violations shall be determined immediately and penalties shall be suspended. This center will relax the traffic circulation. Geographical structure of Kocaeli is suitable for tire wheel system. After all this work we bought 240 12 meter long vehicle. These vehicles are environmentally friendly and have a bicycle carrying device and are suitable for carrying disabled people. The logic of the work of these vehicles will be outside the logic of the old public transport. We built garage and gas filling facilities in Gebze and Gulf for these vehicles. Now we have the 4 dot garage. Main body lines were formed in such a way that the lines did not repeat each other. 93 will even serve you with a total 249 vehicle. The 197 of these vehicles will be operated by the parking lot and the remaining 53 vehicle will be operated. With these vehicles, we aim to carry 45 million passengers annually yolcu.
THERE IS A DIFFERENT FEE TARIFF OF THOUSAND
Underlining that they are continuing negotiations with the Public Transport Cooperatives, Büyükakın said: en Two main models are going on with the cooperatives. One of them is the common pool and rental method, and the other one we will rent their vehicles on certain lines. No consensus has yet been reached on these two models. We want to know that. We have no eye on the artisan's bread. But if the cooperatives cannot provide a standard that will please the citizen, in the last analysis, the service we serve in this city is to serve the citizen and the reason of the existence of the municipality. We certainly don't want our shopkeepers to get hurt. But if the quality of the service provided by the shopkeepers does not satisfy the citizen, we must find a new model at this point. It is not possible to make many changes in Kocaeli due to the system coming from the past. There is currently an 1300 fare tariff in Kocaeli. Because it is very co-operative, you cannot do it on board. 2 95 7 60 5 90 50 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX We've been struggling to merge cooperatives and grow their tools over the past XNUMX years. He worked on them. But at some point, there is no solution. We're still in negotiations. But we've come to this point. While the negotiations were in progress, we established the Transportation Department, the Public Transportation Department and the Transportation Park Inc. We would like to agree on one of these two models, provide the transmission system and a safer, faster transportation. XNUMX XNUMX discount will be applied when the vehicle is switched from one vehicle to another within minutes. we do not want to be a victim of trades while doing so. If we quickly agree on a model, we will continue to walk along the path. We believe that these negotiations will end soon. Kısa

Be the first to comment

Leave a response

Your email address will not be published.


*