Details of Körfez Tube Crossing Project

The details of the Gulf Tube Crossing Project became clear: The details of the project that will connect the two sides of Izmir, which are located between the '35 Project' planned by the Minister of Transport, Maritime Affairs and Communications, Binali Yıldırım, are as follows.

The details of the Gulf Tube Passage, which will ease Izmir transportation, have been announced. Directorate of Highways, the final form of the project, one leg of the coastal Narlıdere Houses, the other side of the Cigli Ataturk Organized Industrial Zone will be.

60 minutes to 12 minutes

The Gulf Tube Passage Project, which is among the '35 Project' planned by İzmir for Transport, Maritime Affairs and Communications Minister Binali Yıldırım, has recently sent a “Let's do it together” message to İzmir residents through the New Century.

In the project, which was discussed by all sections of İzmir last week and planned to connect the two sides of İzmir, a “general situation” and “profile plan dı was made.

The crossing of the project, which will connect Narlıdere and Çiğli, is planned as 12.2 km and 4 thousand 251 meters will be the Gulf Bridge, 800 meter artificial island and thousand 794 meters immersed tube tunnel. In addition, the project will be made by the 16 kilometer rail crossing. The Gulf Crossing Project was planned to be the junction of the Çeşme Motorway in the South. In the north, Sasalı and Ring Road Junction will be connected to each other.

The two pillars of the project will be between Narlıdere Beach Houses and Çiğli Atatürk Organized Industrial Zone. The Gulf Tube Crossing Project will be connected to the tunnel by a two-lane highway. So the 60 minute route will drop to 12 minute. The project is expected to be completed in 2023.

Railway News Search

Be the first to comment

Comments