3 bid received for 12-Tier Grand Istanbul Tunnel Tender

3 bid for 12-Tier Grand Istanbul Tunnel Tender was received: Minister of Transport, Maritime Affairs and Communications, Binali Yildirim stated that 3 offered 23's offer for 12-Decked Grand Istanbul Tunnel Study-Project Tender, and said, İ construction will be done with the tender. As a result, the route will be determined clearly. The contract will be signed with the designated company at the end of the targeted process to be completed in approximately 1 months. Yaklaşık


Lightning, said in a statement, prepared for the purpose of relieving the traffic of Istanbul 3 High-rise Tunnel Project, project and engineering services in the tender for the project, the 14,5 kilometers long Marmaray was put into service and to date 110 million passengers have been transported, 5,5 kilometers long He reported that the Eurasia Tunnel is about to come to an end.

He said that the Prime Minister Ahmet Davutoğlu shared that the 7 Multi-Storeyed Istanbul Tunnel Project, which was shared by the public prior to the 3 June election, was launched to relax the traffic in Istanbul with the cooperation of the Istanbul Metropolitan Municipality and the Ministry of Transport, Maritime Affairs and Communications. work will begin.

This tender will be done, pre-project will be prepared, the main engineering work will be carried out describing Lightning, said:

Ke Barimetric measurements on the seabed, drilling on land and archaeological determinations will be made for this purpose. As a result, the route will be determined clearly. Although a route is shown in the first place, this route will be determined to be more or less north, south to south, or depth. This tender requires extensive work, such as revealing the feasibility of the tunnel, identifying the net route and generating an approximate cost, and preparing preliminary projects. Bu

APPROXIMATE 1AYLIK PROCESS

23 company offers 12 bid bid for the tender, the tender offers, the companies in question before the examination of the prequalification of the 6 company will be asked for financial offers and other requirements, he said.

Yıldırım said that the company will be given 1 for a period of time.
After the completion of this work will continue preparations for the construction of the project stating Lightning, ın We want to do with the construction model, public private partnership. We don't want to do it from the general budget. We don't want to bring a burden on the public. With this, the main documents and model work will be done during this time, pre-feasibility and preliminary projects will be made, simultaneously we will have this information. Again we will be pushed the button for construction, Tekrar he said.

Yildirim, the tender, as well as Turkish, foreign companies, as well as the bid of the Turkish-foreign partnership said.



Be the first to comment

Comments