Ankara High Speed ​​Train Station Project

Ankara High Speed ​​Train Project is unveiled: The High Speed ​​Train Project, one of the giant projects of Ankara, built with the Build-Operate-Transfer Model, is unveiled at the press conference.

With the Build-Operate-Transfer model, the Ankara High Speed ​​Railway Project, which was built in partnership with Cengiz İnşaat, Limak Holding and Kolin İnşaat, will be introduced to the public. Ankara YHT Station will serve 20 thousand and 50 thousand passengers per day. With the Build-Operate-Transfer (BOT) model, the tender will be completed in two years, and will be operated by the contractor company for 19 year 7 month, passenger transportation and high-speed train operation will be executed by TCDD. Ankara YHT Terminal will be transferred to TCDD after 19 year 7 monthly operation period.

GARIN TECHNICAL SPECIFICATIONS

30 meters high, 178 thousand square meters of indoor space and basement floors including 8 floor consisting of a total of XTX, 3 pcs per unit and 6 units will be a high-speed train line. YHT has been designed to meet all the needs of the disabled by using state-of-the-art technology, with all the needs of the passengers such as hotels, offices, shopping malls, restaurants, closed and open parking lots, as a concrete expression of modernization in transportation.
THE OLD GAR IS PROTECTED

While the new High Speed ​​Railway Station was being built, the existing railway station and the surrounding facilities were protected by a history-sensitive planning approach. It was restructured with a functional planning as a new center of attraction. In our history, folk songs, poems and memories of the existing Ankara Gar'a place without touching our culture has been preserved.

ANKARA WILL BE THE CENTER OF LIFE

The new High Speed ​​Railway Station is not only for transportation purposes but also for passengers and passengers; it will be the center of social and cultural life, serving with shops, business offices, cinema and multi-purpose halls, fast food shops and cafes.
ANKARAY TO INTEGRATE TO METRO AND BAŞKENTRAY

The new gar, which will be connected with a transition from above, will be connected with Ankaray, Batıkent Metro, Başkentray, Sincan Metro, Keçiören Metro and Airport Metro and will be the center of Ankara rail system. In this way, passengers and citizens will have easy access to transportation facilities.

Ankara High Speed ​​Train Station

Be the first to comment

Leave a response

Your email address will not be published.


*