The Çed Process Has Started in Eminönü Alibeyköy Tram Line Project

The Çed Process started in the Eminönü Alibeyköy Tram Line Project: The EIA (Environmental Impact Assessment) process was initiated in the Eminönü Alibeyköy tram line project, which will contribute significantly to the traffic of Eyüp and Istanbul. Mayor of Eyüp Remzi Aydın said that Mayor of Istanbul Metropolitan Municipality Kadir Topbaş announced in May that the project will be implemented along the shores of the Golden Horn and that an environmentally sensitive work will be carried out.
Istanbul Metropolitan Municipality Directorate of Transportation Department Rail System Eminönü Alibeyköy started the Environmental Impact Assessment (EIA) process in the rail system project. 492 million 710 thousand TL project includes Fatih and Eyüp districts. The line will consist of 10 rails with a total length of 2 kilometers parallel to each other. The planned route for the tram starts from Eminönü Square and continues along the shore of the Golden Horn and ends in front of Alibeyköy mobile bus terminal.

10 THREE 500 PASSENGER WILL TAKE THE PASSENGER
There will be a total of 14 stations on the route. As of 2023, peak hourly capacity was determined as 10 thousand 500 passenger / hour-direction. 74 vehicle will be stored along the route. The maximum speed of the vehicles is 60 km / h and the commercial speed is 18 km / h.

Eminönü Alibeyköy tram line stops are as follows; Eminönü Square Station, Cibali Station, Balat Station, feshane Station, Eyüp State Hospital Station, Sakarya Neighborhood Station, Alibeyköy Station, Küçük Pazar Station, Fener Station, Ayvansaray Station, Eyüp Cable Car Station, Silahtarağa Station, Alibeyköy Central Station, Alibeyköy Pocket Bus Station .

EMİNÖNÜ ALİBEYKÖY WHAT IS THE TRAINING?
Bağcılar - kabataş In Eminönü by tram line, at Hacıosman - Yenikapı subway line at Küçük Pazar station, Beylikdüzü - Söğütlüçeşme metrobus line at Feshane station, with planned Bayrampaşa -Eyüp tram line at Feshane station, Eyüp - Piyerloti cable car line at Eyüp Sultan station, planned Kazlıçeşme - Söğütlüçeşme It will be integrated with the metro line at the Silahtarağa station, the planned Eyüp - Yeşilpınar cable car line at the Sakarya Mahallesi station, the Mecidiyeköy - Mahmutbey metro line, which is under construction, at the Alibeyköy station, and at the last station of the line with the Seyrantepe - Alibeyköy metro line.

”THE RAILS WILL BE GREEN”
Reminding that the project is an important step that will relax the traffic for Istanbul and Eyüp, Eyüp Mayor Remzi Aydın also stated that it is an environmentalist work. President Aydin, ol 13 will be the distance between the rails of the line will be green. In other words, it will continue through a green line that passes in a greenery at the points it passes and without image pollution when there is no tram. Another desire is to try to build a bicycle path next to the rails if possible se.

Comment

  1. please let a mind out and cancel it he does not fit in the existing path the hooks will not fit in the traffic traffic will return to his hair where the road will expand and no stone can be played within the walls

Leave a response

Your email address will not be published.


*