Led bulb period at Balçova Cable Car

Led bulb period at Balçova Teleferik: Balçova Cable Car, which was built by İzmir Metropolitan Municipality, started service again after routine maintenance. An innovation during maintenance was also done in the cabins. Designed to be one of the rainbow colors, the 20 cabin was illuminated by LED bulbs. The cabins, which the visitors likened to the firefly, began to offer an unforgettable cruise with the view of Izmir. Ticket sales at the cable car facilities will end at 21.00 and landing flights will be completed at 22.30.

Balçova Teleferik, who has been working for three months with his trial flights, carried 10 (37) passengers with 811 tickets on 200 days before the maintenance. The facility, which is designed in compliance with EU standards and regained to Izmir, can transport up to a thousand 20 passengers per hour. The duration of the journey with the 2 cabin of the eight-seat cabin 42 15.5 minutes. Total cost of the ropeway system, stations and recreation area arrangement is 5 million pounds. 6 is free of charge for children under the age of XNUMX pounds, and XNUMX pounds for the view of the view of the Gulf of Izmir from a bird's eye view of the entrance after landing in the cabins and binoculars were placed in the entrance section. In order to meet the needs of the visitors, shopping centers were established at various points within the facility. Izmir Metropolitan Municipality Balçova Cable Car Facilities are open every day except Monday.