Adana metro is in progress, construction of stadium is rapidly progressing

The construction of the stadium is rapidly progressing: the construction of the Koza Arena Stadium continues rapidly. Tribune is rising but the transportation problem has not been solved.

Transportation to the stadium is planned to be mostly provided by the metro, but there are no developments regarding the second stage of the metro.

2016-2017 season, the stadium is considered to be grown. But the subway does not go to the stadium Adanalılar already think.

FUTURE CAN SEE THE SEASON

Koza Arena Stadium started in Adana in the district of Sarıçam a while ago and the stands of the stadium are rising but there is no improvement in the second stage of the subway which will provide transportation to the stadium. 2016-2017 season is expected to reach the completion of the stadium does not make much sense because the metro does not reach the region.

THINKING THE PROBLEM OF TRANSPORTATION

The modern stadium built in Sarıçam will have a capacity of 33 thousand spectators. The 4 side of the tribunes also seems to be the biggest problem of the stadium that will be closed. The route of the second stage of the subway was taken into account when determining the location of the stadium. However, the fact that the stadium construction and the second stage of the subway do not progress simultaneously shows the problems that will be experienced in the future.

THE MINISTRY IS NOT THERE

It will be remembered that the second stage of the subway will be built by the Ministry of Transport and was promised many times during the period of Prime Minister Recep Tayyip Erdoğan. Adana Metropolitan Municipality has prepared the project about the metro and the ministry accepted the project. However, the ministry did not take part in the activity program despite the passing of the Adana metro.

STAT BOŞUNA IS MADE?

The ruling party members place Koza Arena Stadium among the top public investments in Adana. It is stated that the completion of the stadium will not make sense if the second stage of the metro is not implemented. It is stated that the subway train must be completed as no one can go to a place without access.

Be the first to comment

Leave a response

Your email address will not be published.


*