Approaching the end at Ağın Bridge

The end is approaching at Ağın Bridge: The final stage has been reached to finish the 520-meter-long bridge, which is under construction in the district of Ağın, Elazig.
The last stage of the construction of the 520 meter-long bridge in the district of Elazığ has been reached.
The final stage has been reached in the construction of the Ağın Bridge, where the people who travel from Elazig to Ağın district pass through the ferry with their vehicles over the dam due to the Keban Dam, the project of which has been completed and whose construction has been started, to shorten the time loss in transportation and to ease transportation. Ağın Mayor Yılmaz Serttaş said that the last piece of the bridge that will connect the two sides of the bridge construction will be made in early June. Serttaş said, “As a municipality, we mobilize all our facilities to complete the bridge construction in a short time. In addition, we provided work machine and worker support. After the last piece is made, it is left with fine workmanship and the construction of the connecting roads of the bridge. When the bridge is over, those who use the highway will be more comfortable and will be able to cross over the dam without losing time ”.
It was learned that the last piece of the bridge will be placed in the next month and it is planned to be fully operational in August.



Armin

sohbet

Be the first to comment

Comments