Koper-Divaca Second Railway Line Project: The Second Railway Line Construction Project of Koper-Divaca is one of the priorities of the government. Although the necessary permits have been obtained for the construction of the project, the negotiations on financing are continuing. The Ministry of Infrastructure of Serbia will state that the cost of the project will be around 1,4 billion Euros; The EU funds for this project can be provided by 400 million and the remaining financing needs will be met by the railway company by the Koper port operator who will benefit from the line.
Related Articles
China's 1.5 billion dollar rail deal with Iran
China signed a contract with Iran to finance the electrification of a 1.5 km railway from Tehran to the eastern city of Mashhad with a $926 billion loan Iranian publication [more…]
They Protest the Opening of the Ankara - Istanbul YHT Line
Ankara - Istanbul Protesting the Opening of the YHT Line: Haydarpaşa Solidarity on the 39th anniversary of the accelerated train disaster, where 10 people died in Pamukova, and Kadıköy by Urban Solidarity [more…]
Level Blocked Wall
The wall obstructing the view at the level crossing was demolished: The retaining wall that blocked the railway view of the vehicles at the level crossing at the head of Eskimalatya Train Station was demolished by TCDD. Dolamantepe District Bahçe Street [more…]
Be the first to comment