Metrobus road will be kept open at all times

Metrobus road will be kept open for transportation: Snowfall that started in Istanbul and lasted for 3 days alerted IMM. Istanbul has been divided into 9 regions, the metrobus road will be kept open to transportation.

After the warnings of meteorology, the expected snowfall in Istanbul began in the evening. Snow is particularly effective at high cuts. The villages of Çatalca, Arnavutköy, Beykoz and the high sections of Sarıyer and Kartal are among the districts with snowfall. Istanbul Metropolitan Municipality also took necessary measures to increase the effect of snowfall at night.

In a statement from the municipality, Meteorological Directorate of the General Directorate of Disaster Coordination Center (AKOM) meteorology unit according to the weather forecast reports, in Istanbul after midnight snow and storm will be effective.

In the statement, it was noted that the municipality completed its work on roads and squares with a length of approximately 80 thousand kilometers on 308 routes, 4 of which are first priority, within the framework of preparations to combat winter weather conditions.

Department of Road Maintenance and Infrastructure Coordination, 2014-2015 winter season, including the "snow tiger" with the 4 815 1028 personnel and work machines will work with the statement announced that the municipality warehouses 209 thousand tons of salt ready to be kept ready.

TASK DEPARTMENT DONE

In the case of the need of the county municipalities to be supplemented with salt, the following statement was recorded:

“64 tons of solution were stored at 1385 different points. If needed, production will be carried out in solution facilities with a capacity of 25 tons per hour. Vehicle and personnel support will be provided from all units affiliated to Istanbul Metropolitan Municipality and companies that provide service if needed. Firefighters will participate in the activities to be carried out under the AKOM Coordination with 45 disaster response and rescue vehicles and 1058 personnel. Parks and Gardens Department; KadıköyWill work with 223 personnel and 38 vehicles in Taksim, Saraçhane, Yenikapı, Eminönü, Üsküdar, Ümraniye, Beykoz, Göztepe, Kartal squares. ”

613 station, 207 overpass and underpass and 7 garbage transfer station, processing facilities and warehouse area roads will be operated by 616 personnel and 71 vehicles. 147 tractor snow curing team formed by Istanbul Metropolitan Municipality, he made the division of duty to open their village paths açmak said.

The statement, AKOM Directorate of Municipal Police, İSKİ, İETT, İGDAŞ, ISFALT, Traffic Directorate, Health Department, White Table, BEDAŞ, AYEDAŞ, Highways and Police Department officials will work was recorded.

ISTANBUL 9 IS LOCATED IN THE REGION

Istanbul to 9 region for the struggle to combat the adverse weather conditions announced in a statement, said that the path of BRT will be kept open for continuous transportation.

28 is placed in separate points in the main arteries with the BEUS (Frosting Early Warning System) with the 3 hours of ice points will be determined in the highlighted statement, ile Teams 30 will work in places specified by the minute and salting work. The 52 mile-long metrobus road will be open for permanent transportation. Critical intersections 50 units of rescue and attractive 24 hours on the road and remain ready to stay ready for accidents ıcı statements were used.

Be the first to comment

Leave a response

Your email address will not be published.


*