Here are the new metro lines that will carry Istanbul

Here are the new metro lines that will carry Istanbul: 2015 2017 3 annually covering 4-XNUMX years. Levent-Darüşşafaka, Bakırköy-Beylikdüzü and Bakırköy-Kirazlı lines will be activated.

After the Aksaray-Yenikapı metro line, which was opened in Istanbul the day before, eyes were turned into new lines. top place in Turkey and the government under ruins iron network with new projects in Istanbul, the biggest problem is transportation to relieve downtown traffic will be implemented one after the other.

4.LEVENT-DARÜŞŞAFAKA

The 4th Levent-Darüşşafaka metro line, which is 267 thousand 4 meters in length and consists of 4 stations, will be completed next year. The project, which was realized for 324 million 691 thousand TL in total, was taken from Istanbul Metropolitan Municipality in recent months and transferred to the Ministry of Transport, Maritime Affairs and Communications.

BAKIRKOY-BEYLİKDÜZÜ

The two most important metro projects next year will be the Bakırköy-Beylikdüzü and Bakırköy-Kirazlı lines. These two subways will spread over a huge area. Bakırköy-Beylikdüzü subway will be 25 kilometers long and will consist of 18 stations. 1 billion 3 million TL will be spent for the metro line, which is expected to move 163 million passengers a day. This project is aimed to be completed in 2017. Another metro work will take place on Bakırköy-Kirazlı line in 2015. The length of the line that the first pickaxe will hit in the next year will be determined as 9 kilometers, in total there will be 6 stations. The estimated end date of this project, which will cost 1 billion 231 million 673 thousand TL, is also specified as 2017. Both lines were recently transferred to the Ministry of Transport.

Be the first to comment

Leave a response

Your email address will not be published.


*