Gulf crossing bridge is rapidly shaping

The gulf crossing bridge is rapidly shaping: The construction of the gulf crossing bridge, one of the most important pillars of the Istanbul-Izmir Motorway project, continues rapidly.
29 October The construction of the Gulf Crossing Bridge, one of the most important pillars of the Istanbul-Izmir Motorway project, was initiated by President Recep Tayyip Erdoğan, the Prime Minister of the time, at 2010.
Over the past months, the pier towers over the sea level reach the 120 meter and are expected to reach 252 meters by the end of the year. There will be 7 departure, 3 arrival and evacuation route on the bridge which will be composed of 3 strip.
The total price of the 2 thousand 682 square meter construction site with thousand 350 employees and ongoing construction of the road between Istanbul and Izmir will reduce 3,5 hours, the bridge crossing price 35 dollars + VAT. According to today's exchange rate, the bridge's crossing price reaches 95 TL. Highway Inc. The 6 bridge will be the second longest suspension bridge in the world. The bridge is expected to be opened to traffic in 3.

Be the first to comment

Leave a response

Your email address will not be published.


*