Zincirlikuyu Metrobus Station Elevator İBB Agenda

Zincirlikuyu Metrobus Lift Elevator İBB Agenda: At the Zincirlikuyu Metrobus Station de the renovation work will be done in the elevator and it is out of service due to security Dur written 6 was the month! At present, the elevator is defective and has not been renewed!

CHP İBB Council Member, who carried the elevator problem which is necessary for easy access of the disabled citizens to Metrobus stops and overpasses. Hakki Sağlam once again questioned the issue in the written question prepared by him and asked Kadir Topbaş, the Mayor of Istanbul Metropolitan Municipality, the following questions; Adı The elevators at the Zincirlikuyu station do not work for about 6 for months; Ir The elevator will be under renovation and is out of service due to safety “. As of yesterday (11.09.2014), there is no study for 6 months. Why do the elevators at the Metrobus stations not work? 6 months have not been completed renewal process? Which of these elevators were built with each stop based on which method? What is the payment amount based on each stop? What are the reasons for failure of these elevators despite their new construction? Who has been approved by the endorsement of these elevators at the end of production? Is there any deficiency reported to the contractor? If so, what is the detail? Are there any inquiries in this regard? What are the results, if any?

Istanbul Metropolitan Municipality (IMM) Assembly of the Assembly meetings in September 2014 CHP IMM Assembly Members. The written question submitted by the request of Kadir Topbaş, the President of Istanbul Metropolitan Municipality, to be submitted to the Ministry of Parliament with the signatures of Hakkı Sağlam, Seyit Ali Aydoğmuş and Bayram Özata;

Questions to be answered in writing: 11.09.2014
In the Disability Act of 2005, a 7-year period was given for the adaptation of public spaces to the accessibility of the disabled; During the construction of the metrobus road and stops, which started to be built after this date, it was brought to the agenda many times in the assembly that there was no production suitable for disabled access and no elevators were installed.

When we move the issue to the agenda of some metrobus lifts were placed; it was seen that some stops were adapted for disabled access. However, the elevators at the Zincirlikuyu stop do not work for approximately 6 months and the announcement says that da the elevator will be undergoing renovation work and is out of service for safety Ancak. As of yesterday (11.09.2014), there is no study for 6 months.

08.09.2014 17 00 XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX XNUMX First, the elevator's windows were broken and then released by the fire department. The fact that these elevated elevators were out of service shows that the public resource is not used effectively and efficiently and that the necessary inspections are not carried out properly. In this context;

  1. Why do the elevators at the Metrobus stations not work? 6 months have not been completed renewal process?
  2. Which of these elevators were built with each stop based on which method? What is the amount of payment made based on each stop?
  3. What are the reasons for failure of these elevators despite their new construction?
  4. Who has been approved by the endorsement of these elevators at the end of production? Is there any deficiency reported to the contractor? If so, what is the detail?

  5. Are there any inquiries in this regard? What are the results, if any?

Be the first to comment

Leave a response

Your email address will not be published.


*