Logistics Center to be Established in Kars

Logistics Center to be Established in Kars: The Baku-Tbilisi-Kars (BTK) railway line continues day and night. In the second half of 2015, the line, which connects the three countries, continues to work without interruption.

Turkey, Azerbaijan and the Baku-Tbilisi-Kars railway networks will combine Georgia Nearing the end of the railway line. At the end of this year, on the railway line where the 87 is completed, tests are carried out. At the end of 2015, BTK railway line is expected to be fully operational. After the project is completed, the first phase is aimed at transporting 1 million passengers and 6.5 million tons of cargo annually.

The cost of the Project World BTK railway line over $ 500 million, greeted kilometer line 105 295 76 million dollars in Turkey and has built-kilometer section between Kars and Georgian border. section that performs the construction of Turkey, according to double infrastructure was being built as a single parent done, Georgia is received his 200 million dollar loan from Azerbaijan from the border with Turkey about 30 kilometers until Ahilkelek is building a new line and the existing 160-kilometer railway from the overhaul

On the other hand, with the completion of BTK railway line, Azerbaijan State will establish a Logistics Center in Kars. Azerbaijan plans to establish a logistics base on the 30 hectare land in Kars as part of the new incentive system, and hundreds of people will be employed in the logistics center. Azerbaijani goods to those in need, the logistics center channel where the thinking of importing from Turkey.

7 everyone from 70 in Kars heyacanlandır and economically Kars's development, when the development of the most important factors Olac BTK railway line implementation of the Central Asia across the Caspian to connect to Turkey, provision of access over the road between Europe and Central Asia Turkey-Georgia-Azerbaijan-Turkmenistan passing over the rail-sea combined transport connecting Central Asia to the Mediterranean and transit transportation through Central Asia to be held in Kars. The logistics base to be established in Kars will also boost tourism and tourism in the region. The project will solve the logistics problem, which is one of the biggest problems of the East.

OL 2034 MILLION PASSENGER WAS THE 3 MILLION TONE LOAD YIL

AK Party Kars Deputies Ahmet Arslan and Prof. who closely follow every second of the works on the Btk Railway line. Dr. Yunus Kılıç noted that they constantly meet with the relevant ministries and institutions in Ankara for the completion of the BTK Railway line.

AK Party Deputies Ahmet Arslan and Professor underlined that Kars will be established with the BTK Railway line. Dr. Yunus Kılıç emphasized that the people of Kars are comfortable with the Logistics Center and that the Logistics Center will be established in Kars.

Ahmet Arslan, who stated that BTK railway line will be transported with 1 million passengers and 6.5 million tons cargo in the first place. Dr. Yunus Kılıç, 2034 million passengers and 3 million cargoes will be transported in 17 over the BTK line. Yun

The work on the BTK railway line continues at many points between Kars and Çıldır.

 

Be the first to comment

Leave a response

Your email address will not be published.


*