Kınalı Separation - Tekirdağ State road tender concluded

KGM 1st Region Kınalı Separation - Tekirdağ State road tender concluded
Highways (KGM) 1st Region, whose proposals were collected on April 14, 2014, “Kınalı Ayr - Tekirdağ State Highway; The tender for Kumbağ Bridge, Bağlar Bridge, Şerefli Farm Bridge and Karaevli Bridges construction of connection roads ”was concluded.
According to the information received by the Investments Magazine; Hasan İçten - Dörtyol İnşaat joint venture won the tender, whose approximate cost was determined as 10.592.029 liras, with a bid of 7.405.361 liras.
Authorities signed the contract with the contractor recently signed the contract.
Ref .: Investments Magazine 1178 / 21 April 2014 (EE)


Source : I www.yatirimlar.co


sohbet

Be the first to comment

Comments

Related Articles and Advertisements