Breaths were held for the Ordu Ring Road Project

Breaths were held for the Ordu Ring Road Project: The Ordu Ring Road Project Will Save Time and Money When the Army Ring Road Project is completed, the 1 hourly road will be reduced to 10 minutes.
After the completion of the Ordu Ring Road Project, the construction of which started approximately two years ago, it was stated that it would save fuel and time for the citizens.
The work on the Ordu Ring Road, which has a length of 19 kilometers and tunnels of 6,5 kilometers, continues at full speed. After the construction works, the project was welcomed by the people of the region.
WORKS CONTINUES FULL GAS
İrfan Balkanlıoğlu, the Governor of Ordu, who followed the works on the spot, stated that the Ordu Ring Road Project is in full swing.
Explaining that the expropriation process continues on the Ordu Ring Road, with a total cost of 600 million liras, Balkanlıoğlu said, “We have 3 tunnels passing through Boztepe, Öceli and Terzili neighborhoods on this road. Boztepe tunnel is 3 thousand 310 meters, Öceli tunnel is 2 thousand 19 meters and Terzili tunnel is 180 meters. ”
26 MILLION LIRA FUEL SAVINGS WILL BE PROVIDED
Emphasizing that with the completion of the Ordu Ring Road, Balkanlıoğlu emphasizes that it will bring enormous profits to the economy and the Armies.
“There is a feverish work. the most powerful companies of Turkey is conducting studies on this road. For this reason, things are trying to be done quickly. When Ordu Peripheral Road is opened, fuel savings will be provided. Fuel savings of 26 million lira per year will be achieved. This is a huge figure. And people will gain more speed. They will save time. As you know, traffic lights on the road passing through the city and especially the vehicles passing through the transit due to heavy vehicle traffic were suffering huge problems. With the opening of Ordu Ring Road to transportation, they will also win, they will win in Ordu. ”
ONE HOUR WAY 10 WILL GO TO THE MINUTE
Explaining that the 1-hour road will drop to 10 minutes with the opening of Ordu Ring Road, Governor Balkanlıoğlu said:
“The road currently used cost at least 40 minutes for some of our drivers and 1 hour and 2 hours for heavy traffic. Now they will pass this road in 10 minutes. Time will drop to 4 in 1. When this road goes into service, everyone who will save both time and money. There are tunnels and viaducts on the road. These tunnels and viaducts are slowly coming to an end. Hopefully, if there is no problem in the allowance flow, Ordu Ring Road Project will be opened at the end of 2015. ”

Be the first to comment

Leave a response

Your email address will not be published.


*