Project Size of Ankara Istanbul YHT Line

TCDD YHT Train
TCDD YHT Train

Project Size of Ankara Istanbul High Speed ​​Line: Eskisehir-Istanbul stage of Ankara-Istanbul High Speed ​​Train Project, 25 July 2014 On Friday by Prime Minister Recep Tayyip ERDOĞAN, at 14.30 at Eskişehir Station, 15.30 at Pendik Gar hours at the opening ceremony of the 18.30'da.

In 2009, Ankara-Eskişehir, 2011'da Ankara-Konya, 2013'de Eskişehir-Konya YHT lines after the country's fourth YHT line Eskişehir- Istanbul with the introduction of many cities, transportation will be easier, travel time will drop significantly.

Ankara-Istanbul YHT Line, 6 arrival and 6 departure in the first place will be a total of 12 voyage.

Valid departure times from 26.07.2014 date of HRCs:

From Ankara: 06.00, 08.50, 11.45, 14.40, 17.40, 19.00;

From Istanbul (Pendik): 06.15, 07.40, 10.40, 13.30, 16.10, 19.10,

YHTs in the Ankara-Istanbul YHT Line are in the first place; Sincan, Polatli, Eskisehir, Bozüyük, Arifiye, Izmit and Gebze will make a stance according to the departure times.

There will be four classes in the high speed train: business class, business plus, economics, economy plus.

Project Sizes of Ankara-Istanbul High Speed ​​Train Line:
Corridor length: 511 km
Tunnel: 40.829 m (31 pcs)
Longest tunnel: 4.145 m (T36)
Viaduct: 14.555m (27 pieces)
The longest viaduct: 2.333m (VK4)
Bridge: 52 pieces
Underpass and overpass: 212 pieces
Grilles: 620 pieces
Total Art Structure: 942 pieces
Excavation: 40.299.000m3

 

Be the first to comment

Leave a response

Your email address will not be published.


*