Light Looked In Malatya Karahan Tunnel

Light Appeared in Malatya Karahan Tunnel: Governor of Malatya Vasip Şahin, with the accompanying delegation, made investigations in the Karahan Tunnel, which is under construction on the Malatya-Kayseri highway.
According to a written statement from the Governor of Malatya, excavations in the left tube of the tunnel ended during Şahin's investigations.
Şahin, who received information about the works from the authorities, stated that the drilling operations in the right tube will be completed by the end of the year. The tunnel will be put into service as soon as possible. ”
Malatya Metropolitan Municipality Mayor Ahmet Cakir noted that the tunnel is important for Malatya and its region, he said:
“This tunnel will allow traffic flow to relax in a difficult passage. It was difficult for the ground to be broken and slippery. As a result of devoted work, the tunnel was opened in the first section. I hope it will be possible to hold the opening together. ”
Highways Elazig 8. Regional Director Husamettin Ozendi, during the studies in a part of the tunnel lands in the landslide occurred, expressing that the ground is troubled, but all the difficulties passed.
The tunnel was 8 meters width, 7 meter height and a thousand 600 meters long.
Governor Şahin was accompanied by Ali Rıza Kıran, Director of the Road Construction Branch of the General Directorate of Highways, Deputy Commander of the Provincial Gendarmerie Regiment Colonel Mustafa Uğur, Ramazan Keskin, the Governor of Akçadağ, and Ali Kazgan, the Mayor of Akçadağ.

Be the first to comment

Leave a response

Your email address will not be published.


*