Üsküdar-Ümraniye-Çekmeköy-Sancaktepe Metro Line (Video)

Üsküdar-Ümraniye-Çekmeköy-Sancaktepe Metro Line: It will be the second metro line of the Anatolian side of the Üsküdar-Ümraniye-Çekmeköy-Sancaktepe metro, and the entire rail system line will be constructed as an underground tunnel. Metro line will cost 564 million euros.



Kadıköy-As in the Kartal metro line, the route and warehouse area of ​​the trains will be made without drivers in the entire Üsküdar-Ümraniye-Çekmeköy line.

Üsküdar-Sancaktepe 24 will go down in minutes

The line will consist of 20 mileage and 16 station, storage area and 2 bin 750 meter connection tunnels connected to the warehouse. Even the 126 wagon will serve. The construction of the warehouse area will be made within the scope of this work. Metro line will be completed in record time as 38 months. After the completion of the Metro, Üsküdar-Ümraniye-Çekmeköy-Sancaktepe will be landing in 24 minutes. The line will start integrating with Marmaray Üsküdar station and will end near Alemdağ Avenue and Şile Road Junction.

The metro line will include Üsküdar, Fıstıkağacı, Bağlarbaşı, Altunizade, Kısıklı, Libadiye, Çarşı, Ümraniye, İnkılap Neighborhood, Çakmak, Ihlamurkuyu, Altınşehir, Lise, Dudullu, Mass Housing, Çekmeköy and Sancaktepe stations.

Journey times from Çekmeköy-Sancaktepe will be Üsküdar 24, Kartal 59, Yenikapı 36, Taksim 44, Hacıosman 68, airport 68, and Olympic Stadium 78 minutes.


sohbet

Be the first to comment

Comments

Related Articles and Advertisements