Istanbul New Rail System Projects

istanbul raylisistemler map
istanbul raylisistemler map

Istanbul new rail system projects 2014: Istanbul new rail system projects are on the way. 10 is planning a new rail system line. Everywhere subway anywhere subway ??? Istanbul Metropolitan Municipality, which continues its investments without slowing down with the motto, will be the solution to the traffic problem of Istanbul with new rail sitsem investments. Istanbul with the new metro projects from one end of Istanbul to the other end of the transportation will go down to minutes. So which districts will come to the rail system line, what will be the route, when the service will be opened? Here is the answer to all of them and more ..

The first rail system line 2019 ?? Halkalıis coming

The first of the new rail system projects in Istanbul is planned to be put into service at 2019. Halkalı-Arnavutköy-3.Haltan rail line with 33-km line HalkalıHe will connect to the 3.Haveline. 33 will reduce the journey time to 33 Halkalı-3.Airport rail route will be as follows;

  • Halkalı
  • Arnavutkoy
  • NEW xnumx.havalim
  • Sultangazi-Habipler between 34,5 minutes

Sultangazi Habibler-Arnavutköy rail system line consists of 11,5 station on 10 mile line. When the Sultangazi Habibler-Arnavutköy rail system line is completed, the trip time on the 10 line will be reduced to 34,5 minutes. Sultangazi-Arnavutköy rail line will be as follows;

  • İsfalt
  • Old Habibler
  • Tepeüstü
  • Esenbah by
  • Travelers Xinjiang
  • Fenertepe Road
  • Kayaşehir Highway
  • Pine grove
  • public hospital
  • Arnavutkoy Restaurant

Gayrettepe to connect to the 3.Havalimanı

Among the new rail system projects in Istanbul are Gayrettepe-3.Havaliman rail system line. The Xrampepe-Kemerburgaz-2019.Airport rail line is planned to be commissioned after 3. When completed, the 32 will reach 5 minutes from Gayrettepe. The route of the Gayrettepe-3.Airport rail line will be as follows;

  • Gayrettepe
  • Hasdal
  • Kemerburgaz / Göktürk
  • Lights
  • NEW xnumx.havalim

Halkalı 33 from Catalca to land in minutes

Halkalıto travel to Çatalca from 33 minutes Halkalı-Bahçeşehir-Çatalca rail system line is planned to be put into service after 2019. 33 consisting of total 4 stations on the kilometer line Halkalı-The route of the Catalca rail system line will be as follows;

  • Halkalı
  • Bahçeşehir
  • Hadimkoy
  • Catalca

10 will fly to Sabiha Gökçen in minutes

Sabiha Gökçen Airport-Tuzla rail system line will have a length of 6,8. When the Sabiha Gökçen Airport-Tuzla (OSB) rail system line, which is one of the investment plans of Istanbul Metropolitan Municipality after 2019, is completed, the journey time between 2 and 10 will be reduced to XNUMX minutes.
Şişhane den ?? Kabataş 2,5 minutes

Sishane-Kabataş the rail system line will have a line length of 1,7 kilometers. Şişhane- which is planned to be put into service after 2019 -Kabataş When the rail system line is completed, the travel time between 2 districts will decrease to 2,5 minutes.
Esenyurt rail system is coming

The Esenyurt-Beylikdüzü-Avcılar rail system line, planned to be opened after 2019, will have a length of 17 kilometers. When the Esenyurt metro line is completed, the trip time for Esenyurt ?? tan Avcılar will be reduced to 25,5 minutes.

10,5 mile line will pass in 16 minutes

The Büyükçekmece-Esenyurt rail system line is designed with the 10,5 line length. When the Büyükçekmece-Esenyurt rail system line is completed, the journey time between 2 and 16 will be reduced to XNUMX minutes.

Buyukcekmece-Silivri from 49 minutes

Büyükçekmece-Silivri rail system line will have the length of the 32,5 kilometer line. After the 2019 rail line, which is planned to be put into service, the journey time between Büyükçekmece and Silivri will be reduced to 49 minutes.

14,6 to connect to the Sarıyer ??

Beşiktaş-Sarıyer rail system line is planned to be opened after 2019. 14,6 2 journey time will be reduced to 22.

The travel time between Üsküdar and Beykoz will be 22,5

Uskudar-Beykoz rail system line having error length of 15 kilometers. When the Üsküdar-Beykoz rail line is completed, the journey time between 2 and 22,5 will be reduced to 2019 minutes. The line is planned to be put into service after XNUMX.

Comment

  1. ankara raft between the railway system should be taken immediately investment program

Leave a response

Your email address will not be published.


*