Keçiören Subway Line Existing Subway Connection, Macunköy Warehouse Additional Lines and AŞTİ - Söğütözü Extension Project Offers have been collected

AYGM Keçiören Subway Line Existing Subway Connection, Macunköy Storage Area Additional Lines and AŞTİ - Söğütözü Extension Project Offers have been collected
General Directorate of Infrastructure Investments (AYGM) "Keçiören (M4) Metro Line, Existing (M1) Metro Connection Line Electromechanical Systems Supply, Installation and Commissioning Works and Macunköy Warehouse Additional Lines Construction and AŞTİ - Söğütözü Extension Electromechanical System, Assembly and The offers of the "Commissioning Job" tender were collected on 18 March 2014.
According to the information received by the Investments Magazine; The companies participating in the tender with an approximate cost of 62.047.742,83 Euros and their bids (€) were determined as follows:
1. Didoray Construction - Açilim Construction 47.886.000
2. Doğuş Construction 47.990.000
3. Siemens San. Inc. 51.190.000
4. Alsim Alarko 53.267.500
5. Gülermak Heavy Industry - Kolin Construction 54.600.000
6. Eferay Yapı - Nas İnşaat - Cemiloğlu İnşaat 55.865.000
7. Şenbay Mining - Özgün Yapı Acknowledgments
8. Türkerler - Fermak - Emi Yol - Silahtaroğlu Thank You
Ref .: Investments Magazine 1173 / 17 March 2014 (Sb-EA)



Source : I www.yatirimlar.co


sohbet

Be the first to comment

Comments

Related Articles and Advertisements