Level Crossing Closed to Pedestrian and Vehicle Traffic

The Level Crossing is Closed to Pedestrian and Vehicle Traffic: Both Arifiye Arifbey and Arifbey Quarter and Fatih and Neviye Neighborhoods are connected to each other and the ground walkway has been closed to pedestrian and vehicle traffic since Thursday due to the works to be done within the scope of High Speed ​​Train Project.
Arifiye Municipality Directorate of Science Affairs teams, which will create an alternative to the level crossing the bridge at the center of Müselles to connect the Ataturk Street to open the 7 meter-wide path has begun to work. According to information received from the Directorate of Science Affairs; The water, natural gas and electric installations under the level crossing will be displaced via a new 7 meter wide road.
Arifiye Mayor İsmail Karakullukçu said in his statement: “Due to the works carried out within the scope of the High Speed ​​Skin Project, the ground passage was closed to pedestrian and vehicle traffic. The vehicles provide transportation via Fatih Mahallesi Fatih Caddesi. Underpass will be constructed instead of ground passage. We started a study with TCDD officials to ensure that our pedestrians are not victims during construction. We will build a safe footpath for the spring transportation in the construction site. ”

Be the first to comment

Leave a response

Your email address will not be published.


*