CevizliVineyard Metrobus Station Completed

CevizliThe railway station Metrobus completed: by Istanbul Metropolitan Municipality CevizliThe works carried out at the connective metrobus station were completed. In addition to the existing overpasses, the platform 40 meter length, 8 meter wide was built.

In a written statement from the Metropolitan Municipality, it was reminded that the station, which provides the metro-metrobus connection and used as a transfer center, is used by an average of 35 thousand people daily.

To relieve the intensity of turnstile with overpass stairs CevizliIn addition to the existing overpasses at the metro metrobus station, it was stated that the platform was 40 meters long and 8 meter wide platform.

Transfer made to the platform on the new platform, handicapped and elderly citizens for the lift in the statement said that the transfer will take place within a month.

It was stated that the 1.90 meter wide pedestrian ladder is now expanded to 3 meters.

It was reported that the project of the study was carried out by the Istanbul Metropolitan Municipality-Transportation Coordination Directorate and the applications were carried out by the Infrastructure Services Directorate.

Source : gundem.milliyet.com.t is

Armin

sohbet

Be the first to comment

Comments