Attention CevizliOperation at the Metrobus Station

Attention CevizliWork Starts Tomorrow at Bağ Metrobus Station: Istanbul Metropolitan Municipality, CevizliIn addition to the existing overpasses at the Metrobus Station, the vineyard will make the platform 40 meters long and 8 meters wide. During the 30-day work, the Merter side of the station will be open to service and to prevent the density that can be used but experienced during operation, Cevizliuse the Topkapi Station instead of Bağ Metrobüs Station, CevizliIt is suggested that passengers coming from Bağ Metro Station will transfer from Topkapı or Zeytinburnu stations.

According to the municipality, CevizliThe application works of the project, which was prepared to provide pedestrian access more comfortable and safe and to reduce the density, will start at 00.00:XNUMX tomorrow.

The project of the project will be carried out by the Directorate of Transport Coordination Directorate of Istanbul Metropolitan Municipality, Directorate of Infrastructure Services Directorate.

In the station used by the transfer center and used by the daily average 35 thousand people, 40 meter-wide 8 meter-wide platform will be built up to the existing overpasses in order to relieve the density of the overpass ladders and turnstiles.

On the platform to be built, turnstiles will be transported, elevator for disabled and elderly people will be built, and 1.90 meter wide pedestrian ladder will be extended to 3 meters.

Source : I www.haberturk.co

Armin

sohbet

Be the first to comment

Comments