The Beauties of Çemşi Cihan

Bartın and Amasra district between the 21 construction began in May and the excavation work was completed in the autumn of Amasra tunnel 2013 stating that they are planning to open the AK Party Bartin deputy Yilmaz Tunc, looking at the exit of the tunnel overlooking the Amasra cruise terraces and domestic and foreign tourists 'Çeşmi Cihan' She said that she would watch 'the beauties' from the terrace.
Yılmaz Tunç said that the construction of Amasra Tunnel started in 21 May, and that the excavation works of a thousand 65 meters were completed after a short day of work in a short time such as 8 months; said that it will be opened to the end of the transportation.
In his statement, Tunç said, “Our road, which takes 17 minutes from the 30-kilometer curved roads between Bartın and Amasra, will decrease to 6 kilometers with the tunnel after the tunnel is put into service, and the transportation from Bartın to Amasra will be reduced to 5 minutes. Thus, our Bartın city center and our historical and touristic district Çeşmi Cihan Amasra will be united. In addition, with the construction of the Amasra passenger pier, which is under construction, transportation from all over the world to Amasra will be provided by sea. Again, the 11-kilometer section between Bartın and Kurucaşile will be crossed by 5 tunnels. We started the construction of a total of 22 kilometers of tunnels as round trip Works in three of the tunnels continue with a construction site of 550 people, from here I would like to thank our Prime Minister Recep Tayyip Erdogan, our Minister of Transport, Maritime Affairs and Communications, Binalı Yıldırım, and the employees of the Highways Administration and contractor companies, who brought these great investments to Bartın.

Source: your reporter

Armin

sohbet

    Be the first to comment

    Comments