Footprints of the Third Bosphorus Bridge

Yavuz Sultan Selim Bridge Sold
Yavuz Sultan Selim Bridge Sold

Construction of the third Bosphorus bridge to be built in Istanbul has been accelerated. In the construction that started about 1 month ago, the works on the Beykoz Poyrazköy and Sarıyer Garipçe route, where the bridge will pass, became visible.

The places where the feet of the bridge will be placed were determined on both sides. The points where the bridge legs will be placed were leveled and strengthened. While the retaining wall is being built on the rough terrain, the calculations of the engineers continue on the other hand. Journalists entered the construction site in Sarıyer, which is within the military zone, for the first time today. The construction site, which was reached through a dirt road through the forest, has recently turned to mud, due to the rain. Despite this, it was observed that the studies are continuing. It was noteworthy that two big pontoons were placed between the two sides of the sea.

Be the first to comment

Leave a response

Your email address will not be published.


*