Local Tram Passes Silkworm European Tests

Turkey's first TRAM DOMESTIC SILKWORM successfully passed the test of European organizations accredited engineering. Noting that there is no obstacle for the serial production of domestic tram, Metropolitan Municipality Mayor Recep Altepe said that Prime Minister Recep Tayyip Erdogan will come to Bursa for his first drive on the rails.
With the support of Metropolitan Municipality Durmazlar The domestic tram made by the machine has reached the final stage in mass production. The silkworm tram was produced entirely by the design and skill of Turkish engineers. The tram, which will start mass production after the first vehicle is produced, is getting ready to go to Bursa streets. Prime Minister Recep Tayyip Erdoğan will make the first drive of the Silkworm, which has passed all the tests from international accredited organizations in Europe.
Visiting the İhlas News Agency Bursa Regional Directorate, President Recep Altepe gave information about the latest developments. President Recep Altepe said that they received good news from the international accredited institutions for the domestic tram. Standing and Foursquare full capacity of 277 people, the tram has the opportunity to climb 8.2 percent while the slope icon Noting that Turkey's full Altepe, "We are pleased to have achieved domestic production of trams. Turkey, like all we're waiting with great excitement that. This will be Turkey's first brand. On this subject, vehicles were manufactured. Tests are carried out in the factory where it is produced. It passed all kinds of mechanical tests. Accredited engineering organizations in Europe confirmed all of the test results the other day. These organizations give their approval no matter which factory produces what type of vehicle in the world. We also passed this test, "he said.
ACCREDITATORS ARE COMING TO BURSA
Saying that every part of the tram has passed the test, Altepe said, “These vehicles have been tested since the day they were built. Recent tests were also confirmed. It's all over. Foreign experts will come again in about 1 week. He will do his own tests on real rails in Bursa. How he went on the run, how he took the bends was already tested in the virtual environment. These vehicles are carried out in the factory. All kinds of details were seen in the simulations. Now they will see the track on the track. This is the simplest part of the job. ”
PRIME MINISTER ERDOGAN FIRST DRIVING
Prime Minister Recep Tayyip Erdogan, who is planning to be in Bursa in the coming days, will do his first ride of Ipekböceği'nin Altepe, said:
. We conveyed this issue to our Prime Minister. Our prime minister told me that he will be driving when the vehicles are finished. It was already the same in the manufacturing process. At the end of the month of Ramadan, we renewed this promise. I reminded them of this issue at the meeting last month. He said the stadium would look in its final form when it came to the tram. Domestic vehicle production is important to us. When these tender processes are completed, we will see these vehicles on the streets of Bursa Bu.
TECHNICAL SPECIFICATIONS OF K PEKBÃ – CE
Durmazlar The tram, which continues to be produced within the machine, is produced with 205 passenger capacity, 277 cabin steel case, 5 hinged flexible type, colored glass and flame protected composite coated air conditioner. The weight of the vehicle, which is normally loaded 4 tons, reaches 48 tons when loaded. Total 60 KW engine traction and 400 slope climbing performance of the vehicle, laser-equipped, LCD touch screen electronic control system is available. Electronic cards for the motorized traction system of the trams, which will be equipped with the latest technology in terms of comfort and safety equipment, are provided by Siemens.

Source: UAV

Be the first to comment

Leave a response

Your email address will not be published.


*