Fevzipaşa - Pomegranate Line Fulfillment of 2.585,00 Meter Length Ballast Holder Wall for Various Kilometers Between Fevzipaşa - Türkoğlu Stations

The tender for the construction of a 2012-meter-long Ballast Retaining Wall in Various Kilometers between Fevzipaşa - Narlı Line Fevzipaşa - Türkoğlu Stations, numbered 105228/2.585,00, was concluded. The tender with an approximate cost of 832.710,87 TRY was awarded to OKNİNŞAAT TİC.TAA H.LTD.ŞTİ. firm kazanwas.
CONCLUSIONS
GENERAL DIRECTORATE OF THE TURKISH STATE RAILWAYS MANAGEMENT (TCDD) 6. REGIONAL NON-DIRECTORATE DIRECTORATE
Tender registration number: 2012 / 105228
1)
a) Date: 28.08.2012
b) Type: Construction work
c) Procedure: Open
d) Approximate Cost: 832.710,87 TRY
2) Construction work
a) Name: BALLAST HOLDER WALL MAKING 2.585,00 METER LENGTH IN VARIOUS KILOMETERS BETWEEN FEVZİPAŞA - NARLI LINE FEVZİPAŞA - TÜRKOĞLU STATIONS
b) Location: Fevzipaşa-Türkoğlu İst. Cross / GAZIANTEP
c) Duration: 150
3) Offers
a) Document Buyers: 17
b) via EKAP
Number of downloads using e-signature: 14
c) Total Number of Bids: 17
d) Total Current Offers: 17
e) In favor of domestic
Application of price advantage: Not applicable
4) Contract
a) Date: 02.10.2012
b) Price: 412.064,49
c) Duration: 12.10.2012 - 10.03.2013
d) Contractor: OKNİNŞAAT TİC.TAA H.LTD.ŞTİ.
e) the nationality of the contractor: Turkey
It will be publicly honored.