Between the Arifiye-Pamukova Stations 2. Tender, Project, Engineering Services Work

2012/141198 The Tender for the Study, Project, Engineering Services of the 2nd Line Between Arifiye-Pamukova Stations was officially concluded. SWS ENGINEERING SPA won the tender with an approximate cost of 689.728,01 TRY with a bid of 375.150,00 TRY. The contract was signed with the firm that won the tender on 28.11.2012.
CONCLUSIONS
ETÜT PROJECT, ENGINEERING SERVICE WILL BE TAKEN
REPUBLIC OF TURKEY GENERAL DIRECTORATE OF STATE RAILWAYS MANAGEMENT (TCDD)
Tender registration number: 2012 / 141198
1)
a) Date: 31.10.2012
b) Type: Service procurement
c) Procedure: Open
d) Approximate Cost: 689.728,01 TRY
2) Service of the subject
a) Name: ARIFIYE-PAMUKOVA STATIONS 2. HATTIN STUDY, PROJECT, ENGINEERING SERVICES
b) Location: ARIFIYE-PAMUKOVA STATIONS (SAKARYA PROVINCE)
c) Duration: 3 month
3) Offers
a) Document Buyers: 0
b) via EKAP
Number of downloads using e-signature: 0
c) Total Number of Bids: 3
d) Total Current Offers: 3
e) In favor of domestic
Application of price advantage: Not applicable
4) Contract
a) Date: 28.11.2012
b) Price: 375.150,00
c) Duration: 03.12.2012 - 03.03.2013
d) Contractor: SWS ENGİNEERİNG SPA
e) the nationality of the contractor: Turkey

Source : a seasoned

Armin

sohbet

    Be the first to comment

    Comments