Alstom Sao Paulo Metro Line 4 Infrastructure Tender Kazanoutside

alstom san paulo metro
alstom san paulo metro

The tender for the infrastructure procurement works of the second phase of the Alstom Sao Paulo metro line 4-Yellow kazanwas. It has been learned that the portion of the contract belonging to Alstom is worth 40 Million Euros. The second phase of the Sao Paulo metro line-4 is scheduled to open in 2015.

Total 13 km length Alstom Sao Paulo metro line 4 total 11 It consists of a station and is predicted to be used by approximately 1 million people per day.

Alstom is responsible for power supply assembly, telecommunications (cameras, VoIP phone system, TV and sound system in stations), regional control system and other auxiliary systems (fire detection, lighting, ventilation and garden equipment), which constitute 70% of the infrastructure contract.

Map of San Paulo Metro

Similar Ads

Be the first to comment

Comments