Istanbul Metro Bridge Full Gas

The construction of the Istanbul Metro Şişhane-Yenikapı extension line continues under the construction of the Haliç Metro Bridge. On the side of the bridge Unkapanı pylon located on the sea 2. The upper part was placed in place. The first part of the swing bridge, which is located on Unkapanı side of the bridge and which allows the passage of the ships from the Golden Horn, is also placed in place. On the land side, the viaduct and tunnel connections on the Beyoğlu side will be completed in December.

Source: Vatan

Be the first to comment

Leave a response

Your email address will not be published.


*