Avcılar-Kuruçeşme underpass construction begins in the second stage!

Istanbul Metropolitan Municipality, Avcılar-Kuruçeşme Underpass Construction II. 13 starts the stage on Saturday.
Near Avcılar Şükrübey Metrobüs Station, Denizköşkler Neighborhood (Reşitpaşa Street) to the south of D-100 and Gümüşpala District to the north of D-100 (Kuruçeşme Street); D-100 The construction of the Kurucesme Underpass construction, which will connect together under the highway, will be completed on 27 September 2012 and 100 on Avcılar Kucukcekmece direction D-15 is going to be completed on 12-Friday (tomorrow).

13 On October 2012-Saturday, Küçükçekmece Avcılar direction II on D-100. Stage studies will also be completed on Monday at 22 October 2012. The second stage studies will take 10 days.

Küçükçekmece in the direction of Avcılar, 10 will last for the day II. D-100 vehicle traffic during phase operation; to be guided to the side (to Gümüşpala Street) as three lanes. Necessary measures were taken to prevent traffic congestion during the studies. Throughout the study, citizens need to follow traffic signs and pins and choose alternative routes.

Source : I www.emlakkulisi.co

Armin

sohbet

Be the first to comment

Comments