Erdogan gave information about the Marmaray Project

Participating in the 4th Ordinary Congress of the AK Party Istanbul Provincial Presidency filled the TT Arena. Erdogan also mentioned the Marmaray Project in his speech at the 4th Istanbul Ordinary Congress of his party held at Türk Telekom Arena Stadium.
Referring to Prime Minister Erdogan Marmaray Project, they have built 40 stations on Asian and European sides within the scope of the project. Every minute, a train can move on these lines. When the project is completed, between Üsküdar and Sirkeci in 76 minutes, Gebze-Halkalı He said that the distance between the rail system, which has an 105 percent share in urban transportation, will increase to 8 percent.
Erdogan noted that the construction of the Istanbul Bosphorus Highway Bosphorus Tube Crossing Project is underway and the project is carried out from a single tunnel as a double floor, 2 departures - 2 arrivals, Halkalı-Kapıkule between the new railway construction continues.
Erdogan said, “The route starting from Kapikule in the west with the realization of this project will reach Tbilisi through the existing Istanbul-Ankara-Sivas-Erzincan-Erzurum-Kars line to the east, and then reach Baku by the existing railway. Halkalı- Bulgarian Border Railway Survey Project and Engineering Services were completed in 2009. We are planning the construction tender of the 230 km long line between Istanbul-Tekirdağ-Kırklareli and Edirne in the period ahead of us. ”

Source: Morning

Be the first to comment

Leave a response

Your email address will not be published.


*