3. Number of Companies Competing in Bridge Tender Down to 3

The number of companies competing in the tender of the "Northern Marmara Motorway Project's Odayeri-Paşaköy Section", which includes the construction of the 3rd bridge to be built in the Bosphorus, has decreased to 3. In the technical evaluation, 4 out of 3 firms that submitted bids exceeded 70 points required for qualification, while MAPA Construction was out of tender by not getting the necessary qualification score.
According to the information obtained from the Ministry of Transport, Maritime Affairs and Communications and General Directorate of Highways, according to the tender specifications, Deputy Director General of Highways and İhsan Akbıyık, Tender Commission President, and 3. In the meeting attended by the officials of the bidders, the technical qualifications of the firms were evaluated through the 100 score.
Salini-Gülermak Joint Venture, İçtaş Construction Industry Trade Inc.-Astaldi Joint Venture Group and Cengiz Construction-Kolin Construction-Limak Construction-Makyol Construction-Kalyon Construction Joint Venture Group passed the required 70 score for technical competence, MAPA Construction and Trade Inc. did not get the score and remained out of the tender.
In the coming days, the company will be invited to the tender commission to open the offer envelopes.
-4 bid was taken into consideration -
The tender for the “Odayeri-Paşaköy (Including the 3rd Bosphorus Bridge) Section of the Northern Marmara Motorway Project”, which includes the construction of the 3rd bridge to be built in the Bosphorus, was held on April 20 and the tender was Salini-Gülermak Joint Venture, İçtaş İnşaat Sanayi Ticaret AŞ-Astaldi Joint Venture Group, MAPA İnşaat ve Ticaret AŞ and Cengiz İnşaat-Kolin İnşaat-Limak İnşaat-Makyol İnşaat-Kalyon İnşaat were evaluated.

Source: AA

Be the first to comment

Leave a response

Your email address will not be published.


*