Airport Technical Details

istanbul metro map and stops
istanbul metro map and stops

Project Subject: Olimpiyatköy-İkitelli-Çobançeşme-Airport Rail Carriage System
Client: Istanbul Metropolitan Municipality
Start - End: 2006 - 2010
Interference Type: Alone
Detailed Description:

Airport Olimpiyatköy Metro Project: Aksaray-Atatürk Airport subway line at Atatürk Airport Station, which is currently being operated, and the ongoing Otogar-Kirazlı-İkitelli-Başak Houses / Olympic Park metro line and İkitelli South Industrial Station, with the planned Bakırköy-Beylikdüzü metro line, and Çobançeşme It is the construction of an integrated rail transport system line at the station.

First Investment Period: 2012 - 2015

Year of Target (Year of Environmental Plan Access Year): 2023

Feasibility Evaluation Period: 2012 - 2040

Total 11.600 meters long, all underground

9.179 m TBM drilling double tunnel, 48 m open-close tunnel

Total 540 m 4 pieces underground station to be constructed with total 1.561 m 7 units and total 2.101 m 12 pieces NATM (New Austrian Tunneling Method)

Due to the convenience provided by the transportation, there are industrial, manufacturing and wholesale trade areas in the region that are of importance in the country and regional scale (such as İkitilli Organized Industrial Zone, İSTOÇ, etc.), as well as important sports facilities (Atatürk Olympic Park and Stadium) on a national and regional scale.

Services Provided by ESER

  • Detailed Engineering
  • Geophysical Surveys
  • Geotechnical Investigations
  • Basic Engineering
  • Topographical Surveys

Be the first to comment

Leave a response

Your email address will not be published.


*