Eskisehir Hasanbey Logistic Center in Turkey will be openned (Photo Gallery)

Eskisehir Hasanbey Logistic Center in Turkey will be openned :Eskisehir Hasanbey will be the main logistic logistic center of Anatolia for freight transporation. TCDD’s Logistic Center will be openned 19.03.2014.

Start of Work : 30.05.2012
Track Length : 13.000 ballasted single track meter
6.500 single slab track meter
Turnout Quantity : 36 pieces 60E1 R300 1:9 for ballasted track (Mangenenese Frog)
23 pieces 60E1 R300 1:9 for slab track (Mangenenese Frog)
1 piece 60E1 R300 1:9 double crossover
Gauge : 1.435 mm
Type of Sleepers : B70 Concrete Sleepers
Type of Rail : 60 E1
Fastenings : W14

This slideshow requires JavaScript.

Eskisehir Hasanbey Logistic Center in Turkey will be openned -3

 

We, Net Translation Services Limited, are in your disposal with our experienced translator team of 35 persons specialized in Rail Systems Terminology in English, German, Russian, French languages Please visit website: Nettercume.com.tr for our references.

73 / 1.772