Bir Touta-Zeralda Railway

Bir Touta-Zeralda Railway :The Project is located at a distance of 25 km on the south-west of the Algeria capital city, Algiers. It is a new 23 km double-track railway line based on 140 km/h design speed. Once constructed, it will serve as the railway link between the city center and the Zeralda district.

Along the alignment, there are five railway viaducts, 12 overpasses, three prefabricated railway bridges, one cut-and-cover tunnel of 340 m, and 5 stations. The geography being hilly at the zone, the project includes approximately 10 million m3 of earthworks and 30.000 m2 heavy construction structures like bridges and viaducts.

Electrification, signalization (ERTMS Level 1), telecommunication and commissioning are also in the scope of the turn-key contract. Yapı Merkezi (leader, 87 %) – Infrarail (SpA %13) Consortium is realizing the project and it will be finished within 28 months.

Bir Touta-Zeralda RailwaySource : www.ym.com.tr

 

We, Net Translation Services Limited, are in your disposal with our experienced translator team of 35 persons specialized in Rail Systems Terminology in English, German, Russian, French languages Please visit website: Nettercume.com.tr for our references.

72 / 2.049