Work on railway track to start at Shoranur from April 4

Work on railway track to start at Shoranur from April 4 : Indian Railways is taking up non-interlocked working at Shoranur for the introduction of double line between Shoranur and Karakkad stations, and yard re-modelling work at Shoranur for 28 days from April 4. Advantages of this doubling work between Shoranur and Karakkad stations include avoiding detention of trains at Shoranur and Karakkad for crossing and Shoranur – Mangalore junction section will become double line operated section.

One more additional platform number seven with 24 coaches capacity, will be available at Shoranur. This work will entail diversion of trains without touching Shoranur, partial or full cancellation of trains. Additional stoppages will also be provided to trains and some trains will be regulated for periods ranging from 30 minutes to 220 minutes enroute for trains on a case to case basis, S James, public relations officer, Southern Railway said.

Shoranur_railways

Source : indiatimes

We, Net Translation Services Limited, are in your disposal with our experienced translator team of 35 persons specialized in Rail Systems Terminology in English, German, Russian, French languages Please visit website: Nettercume.com.tr for our references.

67 / 1.697