The tender of the Istanbul 3rd bridge came to an end

Binali Yıldırım, the Minister of Transport of Turkey has announced that the tender of the Istanbul 3rd bridge was won by the joint group Içtaş Astaldi Construction Industry and Trading, Inc. Besides this the same join group has won the tender of the North Marmara Highway Project, with the constructions and operation duration of 10 years 2 months and 20 days.

The Minister also mentioned that the required amount of money needed for the construction of the third bridge over the Bosphorus is predicted to be about 2, 5 billion dollars (approximate 4, 5 billion Turkish liras). The minister said that the bridge will be built in 3 years.

3.-Kopru-Ihalesi

We, Net Translation Services Limited, are in your disposal with our experienced translator team of 35 persons specialized in Rail Systems Terminology in English, German, Russian, French languages Please visit website: Nettercume.com.tr for our references.

67 / 1.823