The Brenner Base Tunnel

The Brenner Base Tunnel :The BBT consists of two tubes, each 8.1 m wide, running 70 m apart from one another. These tubes are each equipped with a single track, meaning that train traffic through the tubes is one-way. The two tubes are linked every 333 m by connecting side tunnels. These can be used in emergencies as escape routes. This configuration conforms to the highest security standards for tunnels.

A peculiar feature of the Brenner Base Tunnel (BBT) is the exploratory tunnel running from one end to the other. This tunnel lies between the two main tunnels and about 12 m below them and with a diameter of 5 m is noticeably smaller than the main tubes. The excavations currently underway on the exploratory tunnel should provide information on the rock mass and thereby reduce construction costs and times to a minimum. The exploratory tunnel will be essential for drainage when the BBT becomes operational.

The BBT runs for 64 km between Tulfes/Innsbruck and Fortezza, making it the longest underground railway stretch in the word. The BBT ends in Innsbruck in the existing railway bypass tunnel, which ends in Tulfes. A new rescue tunnel is being built running parallel to the bypass. The two-tube tunnel system between Innsbruck and Fortezza is 55 km long.

The slope in the base tunnel is 6,7 ‰ on the northern side and 4 ‰ on the southern flank of the Brenner. The apex height is 790 above sea level, lying 580 m below the Brenner Pass itself (1,371 m).

The Brenner Base Tunnel-5

Source : www.bbt-se.com

We, Net Translation Services Limited, are in your disposal with our experienced translator team of 35 persons specialized in Rail Systems Terminology in English, German, Russian, French languages Please visit website: Nettercume.com.tr for our references.

27 / 5.121