After Marmaray project Istanbul will have the second passage tube build

After Marmaray project Istanbul will have the second passage tube build :The two sides of the Bosphorus will be connected once more with the world’s 6th great tunnel.
Now in Istanbul was built the world’s 6th great tunnel with a depth of 106 meters which will connect the two ends of the Bosphorus. According to the project the distance between Kazlıçeşme and Goztepe will be reduced from 100 minutes to 15 minutes. The project will help to ease the traffic jam characteristic for Istanbul.
YILDIRIM BAYEZİD will dig
The machine got the name Yıldırım Bayezid, the forth Ottoman sultan that was famous during the history. The machine has a weight of 500 tones and a length of 130 meters and it is manufactured by the German company Herrenknecht. The price of the machine is 150 million dollars. The machine will be brought in November this year and the digging period is supposed to be 1,5 year; each day approximately 10 meters will be dig.
The price will be 4 dollars plus VAT
The total cost of the Eurasia Tunnel Project which was initiated in 2011 is 1 billion 250 million dollars. Within the project the coastal space between Cankurtaran and Kazlıçeşme will be widened to 8 lanes. The tunnel is expected to be opened at the middle of 2015 year. The tunnel will have a capacity of 100 thousand cars. The price of using the tunnel will be of 4 dollars plus VAT.

After Marmaray project Istanbul will have the second passage tube build

We, Net Translation Services Limited, are in your disposal with our experienced translator team of 35 persons specialized in Rail Systems Terminology in English, German, Russian, French languages Please visit website: Nettercume.com.tr for our references.

12 / 2.110